1. Carpentry Works
- Open and close all cabinet doors and drawers
- Check soft-closing hinges and runners
- Look for scratches, chips, or laminate peeling
- Ensure alignment is straight and even
2. Electrical Points & Lighting
- Test every switch and power socket
- Check all light fixtures are working
- Verify USB points, TV points, and internet points
- Ensure no flickering or loose connections
3. Plumbing & Water Supply
- Turn on all taps and showers
- Check water pressure
- Inspect under sinks for leaks
- Test floor traps and drainage flow
4. Tiling & Flooring
- Check for hollow tiles by tapping lightly
- Look for cracks, chips, or uneven surfaces
- Ensure grout lines are consistent
- Verify flooring joints are neat
5. Paint Works
- Inspect under natural light
- Look for uneven color, patches, or stains
- Check corners and ceiling edges
- Ensure touch-up areas are completed
6. Doors & Windows
- Open and close smoothly
- Check locks and handles
- Ensure no gaps or misalignment
- Verify sliding tracks operate properly
7. Countertops & Surfaces
- Check for scratches and chips
- Verify joints and edge finishing
- Ensure silicone sealing is neat
8. Appliance Installation
- Test hob and hood
- Check refrigerator clearance
- Test oven, dishwasher, washing machine, and aircon
- Ensure proper power and water connections
9. Silicone & Finishing Details
- Kitchen backsplash joints
- Bathroom sanitary fittings
- Countertop edges
- Glass panel connections
10. Final Cleaning & Handover
- Remove construction debris
- Check all agreed works are completed
- Request warranty documents
- Keep defect liability period details